Finished off all the boost solenoid/wastegate piping. Done the whole lot in Goodridge fittings and braided hose, quite a few of them with the twin wastegates, took ages making them up. Then protected the hoses near any heat with DEi heat barrier tubing. Refitted the heatshielding to protect the master cylinders and the air box around the air filter to. Thats another job jobbed.
Pretty much ready to go to Oulton Park Friday now, few bits and piece to do tomorrow and we are off.